Camp Shelby Pump Stations 4 & 6 Rehabilitation

Client:

Mississippi Military Department

Location:

Camp Shelby Joint Forces Training Center · near Hattiesburg, Mississippi · Forrest County

In 2008, two lift stations on Camp Shelby’s sewer network were in need of upgrading. The power scheme for Station 4 was integrated with the medical facility it served and too complex; likewise, the station needed relocation to simplify the arrangement of gravity sewers in the area. Station 6 served an area of the base soon to undergo expansion that would exceed its capacity. Both stations suffered from obsolete and malfunctioning  equipment. To meet the base’s higher-ops tempo mission, WGK, Inc., redesigned both stations to include identical pumps for standby failure protection and sub base fuel tanks that hold enough fuel to allow the pumps to operate at full capacity for 24 hours.

  • Identical 180 GPM pumps on Station 4, providing peak flow capacity and standby failure protection.
  • Demolition of existing wet well/ valve pit.
  • Installation of new pump internals, piping, valves, controls and all electrical equipment.
  • Identical 80 GPM pumps on Station 6, providing peak flow capacity and standby failure protection.
  • Installation of new pump internals, piping, valves, controls and all electrical equipment.
  • Complete integration into Camp Shelby SCADA system.
  • Total Project Cost: $338,000.

How can we help?

WGK Engineers Logo

There’s a lot at stake with every infrastructure decision you make. Our team of engineers are dedicated to providing reliable, cost-effective solutions for your infrastructure needs.

Locations

204 West Leake Street
Clinton, MS 39056
601-925-4444

210 Woodgate Drive, South
Suite D
Brandon, MS 39042
601-925-4444

132 West Cherokee Street
Brookhaven, MS 39601
601-833-9598