Clarksdale 2012 CDBG UV Disinfection System

Client:

Clarksdale Public Utilities Commission

Location:

Clarksdale, Mississippi · Coahoma County

During the 2012 SRF project that is part of the WGK Master Plan for the Clarksdale Wastewater Treatment Plant’s rehabilitation, an electrical problem in the UV disinfection system caused complete failure. A separate, emergency repair project was needed to replace the system, and since the SRF loan had already been agreed upon, an application for CDBG funding was sought and approved. The current UV disinfection system was removed and a new vertical-tube system was constructed inside a new operations building. An additional 200 tons of dry sludge were also removed from the facility as part of the CDBG project.

How can we help?

WGK Engineers Logo

There’s a lot at stake with every infrastructure decision you make. Our team of engineers are dedicated to providing reliable, cost-effective solutions for your infrastructure needs.

Locations

204 West Leake Street
Clinton, MS 39056
601-925-4444

210 Woodgate Drive, South
Suite D
Brandon, MS 39042
601-925-4444

132 West Cherokee Street
Brookhaven, MS 39601
601-833-9598