Hobo Forks Pump Station and Force Main

Client:

Natchez Water Works

Location:

Natchez, Mississippi · Adams County

WGK, Inc., was tapped by Natchez Water Works to design a new pump station and force main to serve the new Adams County Correctional Center, a 2,220-man prison complex in Adams County. The entire project was designed and constructed on a fast-track basis to meet with new prison’s schedule, with the design phase completed in 90 days of the contract and construction wrapping up within 240 days. The total project time frame was less than 15 months. Jordan, Kaiser and Sessums of Natchez partnered with WGK to perform construction inspection.

  • Pump station design for Adams County Correctional Center, a 2,200-man prison
  • Installation of 1,000-gallon per minute triplex sewage pump station with generator
  • Installation of odor control system
  • Installation of 55,000 feet of 12” force main
  • Directional bores
  • Rehabilitation of several large diameter sewer and manholes
  • Construction administration
  • Total project cost: $2.9 million

How can we help?

WGK Engineers Logo

There’s a lot at stake with every infrastructure decision you make. Our team of engineers are dedicated to providing reliable, cost-effective solutions for your infrastructure needs.

Locations

204 West Leake Street
Clinton, MS 39056
601-925-4444

210 Woodgate Drive, South
Suite D
Brandon, MS 39042
601-925-4444

132 West Cherokee Street
Brookhaven, MS 39601
601-833-9598